Mushiny shelf-to-person: 8 stations, 80 T6-1500 robots (68 working, the rest charging), 1,264 pods, one 3D Sorter Max with 408 cells. NOR and LOU orders of March 25, 2026 at 80% of company volume. The drop starts at 12:00 PM PT, which is 2:00 PM in Dallas (CT). All aisles are one-way, with four rows of road in front of the stations. A pod turns around at its station's rotation point when the other side has to face the operator. Robots never share a cell: each one books the cells ahead and waits when they are taken.
Building, pods and robot paths, about 4 MB